| Bid Invitation Number |
Bid Results | Advertisement Date | Due Date | Description |
|---|---|---|---|---|
| 4201 | May 10, 2013 | May 24, 2013 | Guardrail Materials | |
| 4200 | May 9, 2013 | May 23, 2013 | Inspection, Testing and Repair Services under a Maintenance Agreement for Emergency Power Generator Systems located at various Commission Buildings | |
| 4199 | Results | Mar 18, 2013 | Apr 2, 2013 | Requirements for approximately 42,200 gallons of Coal Tar pitch Emulsion Concentrate |
| 4197 Plan Holders | Results | Feb 15, 2013 | Mar 4, 2013 | Furnish and Apply Retro-Reflective Pavement Markings on the Ohio Turnpike Mainline Roadway and Interchange Ramps, Milepost 0.0 to 241.2, Located in Williams, Fulton, Lucas, Wood, Ottawa, Sandusky, Erie, Lorain, Cuyahoga, Summit, Portage, Trumbull and Mahoning Counties. |
| 4196 | Results | Feb 19, 2013 | Mar 5, 2013 | Furnishing and Applying Herbicide on Right-of-Way Areas, Between M.P. 0.0 and M.P. 241.2. |
| 4195 Addendum No. 1 | Results | Feb 6, 2013 | Feb 21, 2013 | Requirements for 460,000 Pounds Hot-Pour, Ready Mixed Joint Sealant |
| 4194 | Results | Dec 27, 2012 | Jan 17, 2013 | One (1) Current Model Truck Cab and Chassis, 24,000 lb. GVWR |
| 4192 | Results | Nov 15, 2012 | Nov 30, 2012 | Requirements for Trash, Recyclable & Tire Debris Removal at the Ohio Turnpike Commission's Eight (8) Maintenance Buildings, Administration Building, State Patrol Post 90 and Various Toll Plazas |
| 4191 Addendum No. 1 | Results | Nov 1, 2012 | Nov 27, 2012 | Furnish, Install, Configure and Test, Dispatch Console System Equipment at Two (2) Ohio Turnpike Commission Facilities Located in Cuyahoga County, Ohio |
| 4190 Addendum No. 1 | Results | Sep 27, 2012 | Oct 19, 2012 | For the Furnishing and Installation of One (1) Natural Gas Powered, Current Model year, Emergency Stand-By Generator System |
| 4189 Addendum No. 1 Addendum No. 2 Addendum No. 3 | Results | Sep 11, 2012 | Oct 2, 2012 | Interior and Exterior Service Plaza Furniture |
| 4188 | Results | Aug 21, 2012 | Sep 5, 2012 | Liquid De-Icing/Anti-Icing Material (Magnesium Chloride) |
| 4187 Addendum No. 1 | Results | Aug 9, 2012 | Aug 23, 2012 | Sodium Chloride (Rock Salt) |
| 4186 | Results | Jul 26, 2012 | Aug 9, 2012 | Pneumatic Tires |
| 4185 Addendum No. 1 Addendum No. 2 | Results | Jun 7, 2012 | Jun 28, 2012 | Four (4) Each Current Model Truck Cab and Chassis, 48,000 lb. GVWR and Furnishing and Installing Four (4) Dump Bodies, Front Plows, Wing Plows, Central Hydraulic Systems and Lighting Systems |
| 4184 | Results | Apr 26, 2012 | May 10, 2012 | Repair and Replacement Parts for the Sterling Trucks |
| 4183 Addendum No. 1 | Results | Apr 19, 2012 | May 3, 2012 | Full Matrix Portable Changeable Message Boards |
| 4182 | Results | Apr 11, 2012 | Apr 25, 2012 | 441 Intermediate Course and 302 Base Course Asphalt Concrete for delivery to the Elmore Maintenance Building |
| 4181 | Results | Mar 30, 2012 | Apr 16, 2012 | All Service for Removal, Transportation, Disposal and Testing of Slag Leachate Wastewater from One (1) Location along the Ohio Turnpike |
| 4180 | Results | Mar 16, 2012 | Apr 2, 2012 | All Service and Materials for Laundry, Dry Cleaning, Pressing and Minor Repairs of Maintenance and Toll Collector Uniforms for a Period of Eighteen (18) Months. |
| 4179 | Results | Feb 21, 2012 | Mar 6, 2012 | New Replacement and Repair Parts for Commission Owned ET-2000/Plus and CAT-350 System Impact Attenuators for a period of Two (2) Years |
| 4178 | Results | Feb 2, 2012 | Feb 16, 2012 | Furnishing and Applying Herbicide on Right-of-Way Areas, Between M.P. 0.0 and M.P. 241.2 |
| 4177 Plan Holders | Results | Jan 20, 2012 | Feb 3, 2012 | Furnish and Apply Retro-Reflective Pavement markings on the Ohio Turnpike Mainline Roadway and Interchange Ramps, Milepost 0.0 to 241.2, Located in Williams, Fulton, Lucas, Wood, Ottawa, Sandusky, Erie, Lorain, Cuyahoga, Summit, Portage, Trumbull, and Mahoning Counties |

Bidding documents may be obtained, at the office of the Commission's Procurement Manager, 682 Prospect Street, Berea, Ohio 44017, Telephone (440) 234-2081. Documents will be forwarded to all bidders who have pre-registered with the Commission's Procurement Department.
The General Terms and Conditions, Specifications, Special Provisions, Bid, Affidavit, Contract and Performance Bond are on file and available to any interested person in the aforesaid Procurement Manager's Office. These documents will be forwarded, upon request and without charge, to any prospective Bidder.
Each Proposal must be on the form prescribed by the Commission and must comply with the terms and conditions set forth in the "Contract Documents."
If a Combination Bid Guaranty/Performance Bond will be submitted by a Bidder, such bond must be on a form approved by the Commission. Approved bond forms can be obtained from the Procurement Manager. The certified check, cashier's check, letter of credit or Bid Guaranty Bond, will be held by the Commission as a guaranty that, if any Bid is accepted, the Contract Documents will be executed and the performance of the Bid secured. Each such check, letter of credit or Bid Guaranty Bond, or the proceeds thereof, will be returned or retained as provided in the General Terms and Conditions.
If a Bidder shall refuse to enter into a contract, the amount of the Bid guaranty shall be retained by, or paid to the Commission.
The award of the Contract or Contracts, if any award be made, will be to the lowest responsive and responsible Bidder therefor whose Bid complies with all the prescribed requirements. The Commission reserves the right to reject any and all Bids and to waive technicalities.
This website is a public service provided by the Ohio Turnpike Commission and all information is believed to be accurate. Accessibility issues, inaccurate information, and/or inappropriate, offensive or misleading information on the site should be sent to the customer service department. Content may be distributed or copied; however, photos on this website are the property of AJF Photography and the Ohio Turnpike Commission. Any unauthorized reproduction of photos without permission is strictly prohibited.