Bid Invitation Number |
Bid Results |
Advertisement Date |
Due Date |
Description |
4440
Addendum No. 1
Addendum No. 2
Addendum No. 3
Addendum No. 4
|
Results
Resolution No. 82-2023
|
Aug 7, 2023 |
Sep 1, 2023 |
Diesel Fuel & Gasoline Blends |
4439
Addendum No. 1
|
Results
|
Aug 4, 2023 |
Aug 18, 2023 |
Engines and Equipment Oils & Lubricants |
4438
Addendum No. 1
|
Results
|
Jul 26, 2023 |
Aug 10, 2023 |
Joma Plow Blade Systems & Miscellaneous Plow Parts |
4437
Addendum No. 1
Addendum No. 2
|
Results
|
Jul 19, 2023 |
Aug 2, 2023 |
Snow Plow Blades |
4436
Addendum No. 1
Addendum No. 2
|
Results
|
Jun 21, 2023 |
Jul 6, 2023 |
Furnishing & Installing a Roof Top HVAC Unit at Toll Plaza 49 |
4435
Addendum No. 1
|
Results
|
Jun 16, 2023 |
Jul 3, 2023 |
High-Density Polyurethane (HDP) Injection & Stabilization Services |
4434
Addendum No. 1
|
Results
Resolution No. 61-2023
|
May 8, 2023 |
May 22, 2023 |
Janitorial Services at Eight Maintenance Buildings |
4433
|
Results
|
Apr 27, 2023 |
May 11, 2023 |
Asphalt Concrete Pavement Sealing at TP 218 Salt Dome Lot & Access Road, M.P. 219.4, MB 8 Canfield Maintenance Building & Access Roads, M.P. 228.1, SP 8 Mahoning Valley Service Plaza, M.P. 237.2, SP 8 Glacier Hill Service Plaza, M.P. 237.2, Mahoning County, Ohio |
4432
|
Results
|
Apr 26, 2023 |
May 10, 2023 |
Asphalt Concrete Pavement Sealing at TT Lot 161 North (Lot 1), M.P. 161.8, TT Lot 161 South (Lot 2), M.P. 161.6, TP 161 Salt Dome Lot & Access Road, M.P. 161.6, TT 173, M.P. 173.2, MB 6 Boson Maintenance Building & Access Road, M.P. 173.9, TT 187 TT Lot/Salt Dome Lot, M.P. 187.2, Cuyahoga, Summit, & Portage Counties, Ohio |
4431
Addendum No. 1
|
Results
|
Apr 25, 2023 |
May 9, 2023 |
Asphalt Concrete Paving Sealing at River Road Salt Dome Lot & Access Road, M.P. 93.1, SP 4 Erie Islands Service Plaza, M.P. 100.0, SP 4 Commodore Perry Service Plaza, M.P. 100.0, MB 4 Castalia Maintenance Building & Access Roads, M.P. 106.7, Portland Road Access Roads, M.P. 109.4, Sandusky and Erie Counties, Ohio |
4430
Addendum No. 1
|
Results
|
Feb 10, 2023 |
Feb 27, 2023 |
Inspection, Testing & Repair of Fire Alarm Systems, Fire Sprinkler Systems and Fire Suppression/Extinguishing Systems |
4429
|
Results
|
Jan 24, 2023 |
Feb 7, 2023 |
Guardrail Terminal Parts |
4428
|
Results
Resolution No. 21-2023
|
Jan 17, 2023 |
Jan 31, 2023 |
All Service & Materials for Cleaning of Select Commission Plazas & Ohio State Highway Patrol Post 91 |
4427
|
Results
|
Jan 13, 2023 |
Jan 30, 2023 |
Truck Mounted Full Matrix Changeable Message Boards |
4426
|
Results
|
Jan 4, 2023 |
Jan 19, 2023 |
Contingency Repair of Guardrail, Attenuators, & Fence |
4425
|
Results
|
Dec 28, 2022 |
Jan 17, 2023 |
Traffic Guides |
4424
|
Results
Resolution No. 19-2023
|
Dec 19, 2022 |
Jan 9, 2023 |
Hot-Pour Ready Mix Joint Sealant |
4423
Addendum No. 1
Addendum No. 2
Addendum No. 3
|
Results
|
Dec 14, 2022 |
Jan 13, 2023 |
Testing, Inspection, and Repair Services under a Maintenance Agreement for Emergency Power Generator Systems located at various Commission Buildings |
4422
Addendum No. 1
|
Results
Resolution No. 20-2023
|
Dec 12, 2022 |
Dec 29, 2022 |
All Service and Materials for Cleaning of Select Commission Toll Plazas and Ohio State Highway Patrol Post 89 |
4421
Addendum No. 1
Addendum No. 2
|
Results
Resolution No. 97-2022
|
Nov 21, 2022 |
Dec 7, 2022 |
Pavement Sweeping Service |
4420
|
Results
Resolution No. 78-2022
Resolution No. 99-2022
|
Aug 17, 2022 |
Aug 31, 2022 |
All Service and Materials for Cleaning of Select Commission Toll Plazas and Ohio State Highway Patrol Post 90 & 91 |
4419
Addendum No. 1
Addendum No. 2
|
Results
Resolution No. 72-2022
|
Aug 10, 2022 |
Aug 24, 2022 |
LED Lighting Upgrades |
4418
|
Results
|
Jul 21, 2022 |
Aug 4, 2022 |
Joma Plow Blade Systems & Miscellaneous Plow Parts |
4417
Addendum No. 1
|
Results
|
Jul 8, 2022 |
Jul 22, 2022 |
Snow Plow Blades |
4416
Addendum No. 1
|
Results
|
Jul 6, 2022 |
Jul 20, 2022 |
Engine & Equipment Oils & Lubricants |
4415
Addendum No. 1
|
Results
|
Jul 5, 2022 |
Jul 19, 2022 |
Parts & Service for Cummins Engines |
4414
|
Results
|
Jun 6, 2022 |
Jun 21, 2022 |
Western Star Parts & Service |
4413
|
Results
|
Jun 2, 2022 |
Jun 16, 2022 |
Freightliner Truck Parts & Service |
4412
|
Results
|
Jun 1, 2022 |
Jun 15, 2022 |
Peterbilt Truck Parts & Service |
4411
|
Results
Resolution No. 46-2022
|
May 17, 2022 |
Jun 1, 2022 |
Guardrail Parts |
4410
|
Results
|
May 6, 2022 |
May 20, 2022 |
Maintenance Building Janitorial Services (Kunkle, Elmore, & Castalia) |
4409
|
Results
|
Apr 28, 2022 |
May 12, 2022 |
Asphalt Pavement Sealing 197-209.2 at SP-7 (Portage & Brady's Leap), Bryant Road & TT Lot 209 |
4408
Addendum No. 1
|
Results
Resolution No. 44-2022
|
Apr 27, 2022 |
May 11, 2022 |
Asphalt Pavement Sealing 118.5-141.0 at SP-5 (Middle Ridge & Vermilion Valley), TT Lot 118, OSHP Post 90, Humm Road Access Road, Frailey Road Access & Amherst Maintenance Building |
4407
|
Results
|
Apr 25, 2022 |
May 9, 2022 |
High Density Polyurethane (HDP) Injection & Stabilization |
4406
Addendum No. 1
Addendum No. 2
|
Results
|
Mar 8, 2022 |
Mar 22, 2022 |
Maintenance Building Janitorial Services |
4405
Addendum No. 1
Addendum No. 2
Addendum No. 3
|
Results
Resolution No. 34-2022
|
Mar 10, 2022 |
Mar 24, 2022 |
Fan Fold Toll Tickets |
4404
Addendum No. 1
|
Results
|
Mar 1, 2022 |
Mar 15, 2022 |
Sign Shop Plotter/Cutter |
4403
Addendum No. 1
|
Results
|
Feb 15, 2022 |
Mar 1, 2022 |
TP-173 Light Pole Repairs |
4402
Addendum No. 1
|
Results
|
Jan 11, 2022 |
Jan 25, 2022 |
Traffic Guides |
4401
Addendum No. 1
|
Results
|
Jan 4, 2022 |
Jan 19, 2022 |
Extruded Aluminum Sign Panels |
4400
|
Results
|
Dec 29, 2021 |
Jan 18, 2022 |
Guardrail Terminal Parts |
4399
|
Results
|
Dec 20,2021 |
Jan 5, 2022 |
Contingency Repair of Guardrail, Attenuators, & Fence to Supplement Commission Maintenance Operations & for Emergency Repairs |
4398
|
Results
Resolution No. 06-2022
|
Dec 14, 2021 |
Dec 29, 2021 |
Applying Herbicide on Right-Of-Way Areas, Between M.P. 0.0 & M.P. 241.2 |
4397
|
Results
|
Oct 25, 2021 |
Nov 8, 2021 |
Disposal of Hazardous, Non-Hazardous, & Universal Waste Materials |
4396
Addendum No. 1 |
Results
Resolution No. 65-2021
|
Oct 21, 2021 |
Nov 4, 2021 |
Pavement Sweeping Services |
4395 |
Results
Resolution No. 51-2021
|
Jul 21, 2021 |
Aug 4, 2021 |
Hot-Pour Ready Mixed Joint Sealant |
4394
Addendum No. 1 |
Results
|
Jul 16, 2021 |
Jul 30,2021 |
Service Plaza Tankless Water Heaters |
4393
Addendum No. 1
Addendum No. 2 |
Results
Resolution No. 52-2021
|
Jun 28, 2021 |
Jul 13, 2021 |
Diagnostic Services and Repair/Replacement Parts for Cummins Bridgeway Engines |
4392
|
Results
|
Jun 9, 2021 |
Jun 23, 2021 |
A Complete Maintenance Agreement for Elevators Located at Various Commission Buildings |
4391
|
Results
|
Jun 8, 2021 |
Jun 22, 2021 |
Food Court Chairs |
4390
Addendum No. 1
|
Results
|
Jun 3, 2021 |
Jun 17, 2021 |
High Density Polyurethane (HDP) Stabilization Services |
4389
Addendum No. 1
|
Results
|
Jun 2, 2021 |
Jun 21, 2021 |
High Mast LED Fixtures for Toll Plaza 173 |
4388
|
Results
|
May 20, 2021 |
Jun 4, 2021 |
Engine and Equipment Oils and Lubricants |
4387
Addendum No. 1
Addendum No. 2
Addendum No. 3
|
Results
|
Feb 16, 2021 |
Mar 4, 2021 |
Janitorial Services at Eight (8) Ohio Turnpike and Infrastructure Commission Maintenance Buildings |
4386
Addendum No. 1
|
Results
|
Feb 12, 2021 |
Mar 1, 2021 |
Lawn Care Services at Fourteen (14) Ohio Turnpike Service Plazas |
4385
|
Results
|
Feb 4, 2021 |
Feb 18, 2021 |
Asphalt Concrete Pavement Sealing at TT Lot 71, M.P. 71.1; SP-3 Blue Heron Service Plaza, M.P. 76.9; SP-3 Wyandot Service Plaza M.P. 76.9; Martin Williston Road Access Roads, M.P. 78.8; Wood, Sandusky and Ottawa Counties, Ohio |
4384
Addendum No. 1
ATTACHMENT A - BidGuarantyBond-PerformanceBond
|
Results
|
Feb 3, 2021 |
Feb 17, 2021 |
Asphalt Concrete Pavement Sealing of Lots and Roads at Five (5) Facilities in Williams, Fulton and Lucas Counties, Ohio |
4383 |
Results
|
Jan 7, 2021 |
Jan 22, 2021 |
Traffic Guides |
4382
|
Results
|
Dec 29, 2020 |
Jan 15, 2021 |
Contingency Repair of Guardrail Attenuators, Signs and Fence to Supplement Commission Maintenance Operations and for Emergency Repairs |
4381
|
Results
|
Dec 17, 2020 |
Jan 5, 2021 |
Extruded Aluminum Sign Panels |
4380
Addendum No. 1
Addendum No. 2
|
Results
Resolution No. 83-2020
|
Nov 23, 2020 |
Dec 8, 2020 |
Pavement Sweeping Service |
4379 |
Results
Resolution No. 81-2020
|
Nov 19, 2020 |
Dec 4, 2020 |
Approximately 575,000 pounds Hot-Pour Ready Mixed Joint Sealant |
4378
Addendum No. 1
|
Results
|
Nov 13, 2020 |
Dec 1, 2020 |
Janitorial Services at Six (6) Ohio Turnpike and Infrastructure Commission Maintenance Buildings |
4377
|
Results
Resolution No. 82-2020
|
Nov 10, 2020 |
Nov 24, 2020 |
Commercial Propane-Liquefied Petroleum Gas Fuel and Storage Equipment for Nine (9) Locations |
4376
|
Results
Resolution No. 73-2020
|
Sep 21, 2020 |
Nov 4, 2020 |
Guardrail Materials |
4375
|
Results
Resolution No. 69-2020
|
Sep 15, 2020 |
Sep 29, 2020 |
Cut and Rolled Magnetic Toll Tickets |
4374
Addendum No. 1
|
Results
|
Sep 2, 2020 |
Sep 16, 2020 |
Motorist Safety Patrol and Incident Response Services on the Ohio Turnpike during various shifts and within given zones |
4373
|
Results
|
Aug 25, 2020 |
Sep 9, 2020 |
Diagnostic Services and Repair/Replacement Parts for Cummins Bridgeway Engines |
4372
Addendum No. 1
|
Results
Resolution No. 61-2020
Resolution No. 71-2022 |
Aug 12, 2020 |
Aug 28, 2020 |
Ultra Low Sulfur Diesel Fuel and Unleaded Gasoline/Ethanol Blend |
4371
|
Results
|
Jul 22, 2020 |
Aug 5, 2020 |
Freightliner Truck Parts and Service |
4370
|
Results
|
Jul 13, 2020 |
Jul 27, 2020 |
Peterbilt Truck Parts and Service |
4369 |
Results
|
Jul 8, 2020 |
Jul 22, 2020 |
Sterling Truck Parts and Service |
4368
|
Results |
Jul 6, 2020 |
Jul 20, 2020 |
Western Star Truck Parts and Service |
4367
|
Results
|
Jun 29, 2020 |
Jul 13, 2020 |
New Replacement and Repair Parts for Commission Owned System Impact Attenuators |
4366 |
Results
|
Jun 24, 2020 |
Jul 8, 2020 |
High Density Polyurethane (HDP) Stabilization Services |
4365
***COVID-19 UPDATE***
|
Results
|
Mar 16, 2020 |
Mar 30, 2020 |
Guardrail Materials |
4364
***COVID-19 UPDATE***
Addendum No. 1
Addendum No. 2
|
Results
|
Mar 11, 2020 |
Mar 25, 2020 |
A complete Maintenance Agreement for Elevators Located at Various Commission Buildings, for a Period of One (1) Year |
4363
Addendum No. 1
|
Results
|
Feb 10, 2020 |
Feb 24, 2020 |
All Service for Removal, Transportation, Disposal and Testing of Slag Leachate Wastewater from One (1) Location along the Ohio Turnpike |
4362 |
Results
Resolution No. 16-2020 |
Feb 5, 2020 |
Feb 19, 2020 |
Furnish and Apply Herbicide on Right-of-Way Areas, Between M.P. 0.0 and M.P. 241.2 |
4361
|
Results
|
Jan 30, 2020 |
Feb 13, 2020 |
Lawn Care Services at Fourteen (14) Ohio Turnpike Service Plazas |
4360
Addendum No. 1
|
Results
|
Jan 28, 2020 |
Feb 14, 2020 |
Contingency Repair of Guardrail Attenuators, Signs and Fence to Supplement Commission Maintenance Operations and for Emergency Repairs |
4359
|
Results
|
Dec 16, 2019 |
Jan 6, 2020 |
Extruded Aluminum Sign Panels |
4358
|
Results |
Dec 6, 2019 |
Dec 20, 2019 |
A Complete Maintenance Agreement for Elevators Located at Various Commission Buildings, for a Period of One (1) Year |
4357
|
Results
|
Nov 22, 2019 |
Dec 9, 2019 |
All Service for Removal, Transportation, Disposal and Testing of Slag Leachate Wastewater from One (1) Location along the Ohio Turnpike. |
4356
|
Results
Resolution No. 6-2020
|
Nov 21, 2019 |
Dec 6, 2019 |
Pavement Sweeping Service |
4355
|
Results
|
Nov 5, 2019 |
Nov 19, 2019 |
Janitorial Services at five (5) Ohio Turnpike and Infrastructure Commission Maintenance Buildings |
4354
Addendum No. 1
|
Results
Resolution No. 73-2019
|
Oct 7, 2019 |
Oct 22, 2019 |
All service and materials for cleaning of all the Commission's Toll Plazas and Ohio State Highway Patrol Post 89, 90 & 91 |
4353
Addendum No. 1
|
Results
Resolution No. 47-2019
|
Sep 9, 2019 |
Sep 23, 2019 |
Approximately 575,000 pounds hot-pour ready mixed joint sealant |
4352
|
Results
|
Sep 5, 2019 |
Sep 19, 2019 |
Twelve Month Service Contract for the Inspection, Testing and Repair of Fire Alarm Systems, Fire Sprinkler Systems and Fire Suppression/Extinguishing Systems Located in Various Commission Buildings |
4351
|
Results
|
Sep 4, 2019 |
Sep 18, 2019 |
Guardrail Materials |
4350
|
Results
|
Aug 8, 2019 |
Aug 22, 2019 |
Diagnostic Software, Repair/Replacement Parts and Service for Cummins Bridgeway Engines |
4349
|
Results
|
Jun 28, 2019 |
Jul 12, 2019 |
Diagnostic Services and Repair/Replacement Parts for Cummins Bridgeway Engines |
4348
Addendum No. 1
Addendum No. 2
Addendum No. 3
|
Results
|
Jun 18, 2019 |
Jul 11, 2019 |
Asphalt Concrete Pavement Sealing of Lots and Roads at Five (5) Facilities in Mahoning County, Ohio |
4347
Addendum No. 1
Addendum No. 2
Addendum No. 3
|
Results
|
Jun 11, 2019 |
Jul 11, 2019 |
Asphalt Concrete Pavement Sealing of Lots and Roads at Five (5) Facilities in Sandusky and Erie Counties, Ohio |
4346
|
Results
|
Jun 7, 2019 |
Jun 21, 2019 |
Asphalt Concrete Pavement Sealing at Six (6) Facilities in Cuyahoga, Summit and Portage Counties, Ohio |
4345
|
Results
|
May 13, 2019 |
May 29, 2019 |
Concrete Cutting Saws |
4344
Addendum No. 1
|
Results
|
Apr 16, 2019 |
May 7, 2019 |
Interior and Exterior Service Plaza Furniture |
4343
|
Results
|
Apr 8, 2019 |
Apr 23, 2019 |
Inspection, Testing and Repair Services under a Maintenance Agreement for Emergency Power Generator Systems Located at various Commission Buildings |
4342
|
Results
|
Apr 5, 2019 |
Apr 22, 2019 |
High Density Polyurethane (HDP) Stabilization Services |
4341
|
Results
|
Mar 13, 2019 |
Mar 27, 2019 |
Contingency Repair of Guardrail Attenuators, Signs and Fence to Supplement Commission Maintenance Operations and Emergency Repairs |
4340
Addendum No. 1
Addendum No. 2
Addendum No. 3
Addendum No. 4
|
Results
|
Mar 6, 2019 |
Mar 29, 2019 |
Eight (8) each Tack Trailers |
4339
Addendum No. 1
Addendum No. 2
|
Results
Resolution No. 24-2019
|
Feb 27, 2019 |
Mar 19, 2019 |
Receiving of Non-Hazardous Petroleum Contaminated Soil for Disposal |
4338 |
Results
Resolution No. 19-2019 |
Feb 11, 2019 |
Feb 26, 2019 |
Furnishing and Applying Herbicide on Right-of-Way Areas, Between M.P. 0.0 and M.P. 241.2 |
4337
Addendum No. 1
Addendum No. 2
Addendum No. 3
Addendum No. 4
Addendum No. 5
|
Results
Resolution No. 24-2019
|
Feb 7, 2019 |
Mar 18, 2019 |
Transportation Hauling of Non-Hazardous Petroleum Contaminated Soil |
4336
|
Results
|
Feb 6, 2019 |
Feb 20, 2019 |
Receiving of Non-Hazardous Petroleum Contaminated Soil for Disposal |
4335
|
Results
|
Jan 17, 2019 |
Jan 31, 2019 |
Traffic Guides |
4334
Addendum No. 1
Addendum No. 2
|
Results |
Jan 16, 2019 |
Jan 31, 2019 |
All Service for Removal, Transportation, Disposal and Testing of Slag Leachate Wastewater from One (1) Location along the Ohio Turnpike |
4333
Addendum No. 1
|
Results
|
Jan 15, 2019 |
Jan 29, 2019 |
Lawn Care Services at Fourteen (14) Ohio Turnpike Service Plazas |
4332
Addendum No. 1
|
Results
|
Dec 20, 2018 |
Jan 14, 2019 |
Pavement Sweeping Service |
4331
|
Results
|
Dec 20, 2018 |
Jan 8, 2019 |
Extruded Aluminum Sign Panels |
4330
Addendum No. 1
|
Results
|
Dec 10, 2018 |
Jan 3, 2019 |
Ten (10) Hydraulic Elevating Trailers |
4329 |
Results
Resolution No. 7-2019
|
Nov 29, 2018 |
Dec 13, 2018 |
Approximately 555,000 Pounds Hot-Pour Ready Mixed Joint Sealant |
4328
|
Results
|
Nov 28, 2018 |
Dec 12, 2018 |
All Services and Materials for Laundry, Dry Cleaning, Pressing and Minor Repairs of Toll Collector Uniforms |
4327
Addendum No. 1
|
Results
|
Nov 9, 2018 |
Nov 27, 2018 |
Steel Rocker Bearings and Elastomeric Bearings |
4326
Addendum No. 1
Addendum No. 2
|
Results
|
Nov 7, 2018 |
Nov 21, 2018 |
Janitorial Services at Four (4) Ohio Turnpike Commission Maintenance Buildings |
4325
Addendum No. 1
Addendum No. 2
Addendum No. 3
Addendum No. 4
|
Results
Resolution No. 67-2018
|
Oct 19, 2018 |
Nov 2, 2018 |
Bridge Structural Steel |
4324
|
Results
|
Oct 2, 2018 |
Oct 16, 2018 |
Ten (10) Each Hydraulic Elevating Trailers |
4323
Addendum No. 1
|
Results
|
Sep 24, 2018 |
Oct 9, 2018 |
Two (2) Each Current Model, One (1) Ton Extended Cab Rear-Wheel Drive Pickup Truck with a 164-inch Wheelbase |
4322
|
Results
Resolution No. 61-2018
|
Sep 14, 2018 |
Sep 28, 2018 |
Guardrail Materials |
4321
|
Results
Resolution No. 55-2018
|
Aug 8, 2018
|
Aug 22, 2018 |
Removal, Transport and Disposal of Wastewater Sludge & Floor Drain/Storm Water Treatment Waste |
4320
|
Results
|
Jul 2, 2018 |
Jul 17, 2018 |
Western Star Truck Parts and Service |
4319
|
Results
|
Jun 29, 2018 |
Jul 16, 2018 |
Sterling Truck Parts and Service |
4318
|
Results
|
Jun 27, 2018 |
Jul 19, 2018 |
Peterbilt Truck Parts and Service |
4317
|
Results
|
Jun 4, 2018 |
Jun 18, 2018 |
Diagnostic Services and Repair/Replacement Parts for Cummins Bridgeway Engines |
4316
|
Results
|
May 29, 2018 |
Jun 12, 2018 |
New Repair and Replacement Parts for Commission owned ET-2000/Plus, ET-31, SRT-27/350, SRT-31, CAT-350, SKT-SP-350 and SKT-SP-MGS System Impact Attenuators for a Period of Two (2) Years |
4315
|
Results
|
Apr 24,2018 |
May 8, 2018 |
Diagnostic Services and Repair/Replacement Parts for Cummins Bridgeway Engines |
4314
|
Results
|
Mar 27, 2018 |
Apr 10, 2018 |
High Density Polyurethane (HDP) Stabilization Services |
4313
|
|
Feb 5, 2018 |
CANCELLED |
All Service and Materials for Laundry, Dry Cleaning, Pressing and Minor Repairs of Maintenance and Toll Collector Uniforms for a Period of Twelve (12) Months |
4312
|
Results
|
Jan 25, 2018 |
Feb 8, 2018 |
Furnish and Apply Herbicide on Right-of-Way Areas, Between M.P. 0.0 and M.P. 241.2 |
4311
Addendum No. 1
|
Results
|
Jan 24, 2018 |
Feb 7, 2018 |
Traffic Guides |
4310
Addendum No. 1
|
Results
|
Dec 6, 2017 |
Dec 20, 2017 |
Extruded Aluminum Sign Panels |
4309
|
Results
|
Nov 15, 2017 |
Nov 30, 2017 |
Pavement Sweeping Service During 2018 |
4308
|
Results
Resolution No. 55-2017
|
Oct 23, 2017 |
Nov 6, 2017 |
Requirements for Furnishing Approximately 650,000 Pounds Hot-Pour Ready Mixed Joint Sealant |
4307
Addendum No. 1
|
Results
|
Oct 4, 2017 |
Oct 19, 2017 |
All Service for Removal, Transportation, Disposal and Testing of Slag Leachate Wastewater from one (1) Location along the Ohio Turnpike |
4306
Addendum No. 1
|
Results
|
Sep 25, 2017 |
Oct 10, 2017 |
Eight (8) Each Utility Body and Power Liftgates |
4305
Addendum No. 1
|
Results |
Aug 15, 2017 |
Aug 29, 2017 |
Eight Hot Water Pressure Washers and Eight Undercarriage Wash Units |
4304
|
Results
|
Aug 14, 2017 |
Aug 28, 2017 |
Guardrail Materials |
4303
|
Results
Resolution No. 39-2017
|
Jul 24, 2017 |
Aug 7, 2017 |
Motorist Safety Patrol and Incident Response Services on the Ohio Turnpike |
4302 |
Results
Resolution No. 42-2017
|
Jul 12, 2017 |
Jul 31, 2017 |
Cut and Rolled Magnetic Toll Tickets |
4301
Addendum No. 1
Addendum No. 2
Addendum No. 3
Addendum No. 4 Addendum No. 5
Addendum No. 6
|
Results
Resolution No. 41-2017
|
Jun 21, 2017 |
Jul 19, 2017 |
Ultra Low Sulfur Diesel Fuel and Unleaded Gasoline/Ethanol Blend |
4300
Addendum No. 1
Addendum No. 2
|
Results
Resolution No. 40-2017
|
Jun 2, 2017 |
Jun 30, 2017 |
Commercial Propane-Liquefied Petroleum Gas Fuel and Storage Equipment for Nine (9) Locations |
4299
Addendum No. 1
Addendum No. 2
Addendum No. 3
Addendum No. 4
Addendum No. 5
|
Results
Resolution No. 38-2017
Resolution No. 47-2017
|
Jun 1, 2017 |
Jul 28, 2017 |
Removal, Transport and Disposal of Wastewater Sludge & Floor Drain/Storm Water Treatment Waste |
4298
Addendum No. 1
|
Results
|
May 31, 2017 |
Jun 21, 2017 |
All Service for Removal, Transportation, Disposal and Testing of Slag Leachate Wastewater from one (1) location along the Ohio Turnpike |
4297
|
Results
|
May 1, 2017 |
May 15, 2017 |
Truck Mounted Full Matrix Changeable Message Boards |
4296 |
Results
|
Apr 27, 2017 |
May 11, 2017 |
Diagnostic Services and Repair/Replacement Parts for Cummins Bridgeway Engines |
4295 |
Results
Resolution No. 27-2017
|
Apr 26, 2017 |
May 10, 217 |
Fifteen (15) each Truck Mounted Attenuators |
4294
Addendum No. 1
|
Results
Resolution No. 28-2017
|
Apr 25, 2017 |
May 9, 2017 |
Four (4) each Commercial-Duty Slope Mowers |
4293
Addendum No. 1
|
Results
|
Apr 5, 2017 |
Apr 20, 2017 |
Inspection, Testing and Repair Services under a Maintenance Agreement for Emergency Power Generator Systems located at various Commission Buildings |
4292
Addendum No. 1
|
Results
Resolution No. 20-2017
|
Mar 21, 2017 |
Apr 4, 2017 |
Retroreflective and Non-Reflective Sheeting and Electronic Cuttable Overlay Film |
4291
Addendum No. 1
|
Results
|
Mar 14, 2017 |
Mar 28, 2017 |
Eight (8) each Fourteen (14') Foot Commercial Grade Enclosed Cargo Trailer |
46-2017 - Pavement Markings
Plan Holders
|
Results
|
Mar 2, 2017 |
Mar 23,2017 |
**IN THE FUTURE THIS PROJECT WILL BE FOUND UNDER MISCELLANEOUS CONSTRUCTION** Furnish and Apply Retro-Reflective Pavement Markings |
4290
Addendum No. 1
|
Results
|
Mar 1, 2017 |
Mar 16, 2017 |
Traffic Guides |
4289
Addendum No. 1
|
Results
|
Feb 7, 2017 |
Feb 22, 2017 |
For Furnishing and Applying Herbicide on Right-of-Way Areas, Between M.P. 0.0 and M.P. 241.2 |
4288
|
Results
|
Jan 13, 2017 |
Jan 27, 2017 |
Extruded Aluminum Sign Panels |
4287
Addendum No. 1
|
Results
Resolution No. 12-2017
|
Jan 3, 2017 |
Jan 18, 2017 |
Pavement Sweeping Service |
4286
Addendum No. 1
|
Results
|
Dec 19, 2016 |
Jan 5, 2017 |
All Service and Materials for Cleaning of The Commission's Toll Plazas and Ohio State Highway Patrol Post 91 |
4285
|
Results
Resolution No. 6-2017
|
Dec 1, 2016 |
Dec 15, 2016 |
560,000 Pounds Hot-Pour Ready Mixed Joint Sealant |
4284
Addendum No. 1
|
Results
|
Nov 16, 2016 |
Dec 2, 2016 |
All Service and Materials for Laundry, Dry Cleaning, Pressing and Minor Repairs of Maintenance and Toll Collector Uniforms for a Period of Twenty-four (24) Months |
4283 |
Results
|
Nov 2, 2016 |
Nov 16, 2016 |
Guardrail Materials |
4282
Addendum No. 1
Addendum No. 2
|
Results
Resolution No. 65-2016
|
Oct 19, 2016 |
Nov 2, 2016 |
Radar Speed Display Signs with Support Assemblies |
4281
Addendum No. 1
Addendum No. 2
Addendum No. 3
|
Results
|
Oct 7, 2016 |
Oct 31, 2016 |
A Twelve Month Service Contract (with an option for two (2) additional one (1) year renewals) for the Inspection, Testing and Repair of Fire Alarm Systems, Fire Sprinklers and Fire Suppression/Extinguishing Systems Located in Various Commission Buildings |
4280
Addendum No. 1
|
Results
Resolution No. 61-2016
|
Sep 16, 2016 |
Sep 30, 2016 |
All Service and Materials for Cleaning of all the Commission's Toll Plazas and Ohio State Highway Patrol Post 89, 90 & 91 |
4279
|
Results
|
Aug 16, 2016 |
Aug 30, 2016 |
Truck Mounted Full Matrix Changeable Message Boards |
4278
Addendum No. 1
Addendum No. 2
|
Results
|
Jul 18, 2016 |
Aug 1, 2016 |
Pneumatic Tires |
4277 |
Results
Resolution No. 53-2016
|
Jul 8, 2016 |
Jul 22, 2016 |
Organic-Based, Corrosion-Inhibited Liquid De-Icing/Anti-Icing Material |
4276 |
Results
|
Jul 6, 2016 |
Jul 20, 2016 |
Engine and Equipment Oils and Lubricants, for a period of One (1) year |
4275
Addendum No. 1
|
Results
|
Jul 5, 2016 |
Jul 19, 2016 |
Peterbilt Truck Parts and Service |
4274
|
Results
|
Jun 8, 2016 |
Jun 22, 2016 |
Replacement Parts and Service Labor For Sterling Trucks |
4273 |
Results
|
Jun 7, 2016 |
Jun 21, 2016 |
New Repair and Replacement parts for Commission owned ET-2000/Plus™, ET-31™, SRT-27/350™, SRT-31™, CAT-350™, SKT-SP-350™, and SKT-SP-MGS™ System Impact Attenuators for a period of Two (2) years |
4272
|
Results
Resolution No. 46-2016
|
May 13, 2016 |
May 27, 2016 |
Removal, Transport and Disposal of Wastewater Sludge & Floor Drain/Storm Water Treatment Waste |
4271
|
Results
|
May 9, 2016 |
May 23, 2016 |
Diagnostic Services and Repair/Replacement Parts for Cummins Bridgeway Engines |
4270
|
Results
|
Apr 12, 2016 |
Apr 26, 2016 |
Truck Mounted Full Matrix Changeable Message Boards |
4269 |
Results
|
Apr 6, 2016 |
Apr 20, 2016 |
Eight (8) Each Front-Mount Riding Lawn Mowers |
4268
Addendum No. 1
Addendum No. 2
Addendum No. 3
|
Results
Resolution No. 38-2016
|
Apr 4, 2016 |
Apr 21, 2016 |
Removal, Transport and Disposal of Wastewater Sludge & Floor Drain/Storm Water Treatment Waste |
4267
Addendum No. 1
|
Results
Resolution No. 30-2016
|
Mar 17, 2016 |
Apr 1, 2016 |
One (1) each Current Model Truck Cab and Chassis and Furnishing and Installing One (1) Sixty (60) Foot Aerial Device with Digger |
4266
Plan Holders
|
Results
Resolution No. 29-2016
|
Mar 3, 2016 |
Mar 17, 2016 |
Furnish and Apply Retro-Reflective Pavement Markings on the Ohio Turnpike Mainline Roadway and Interchange Ramps, Milepost 0.0 to 241.2. Williams, Fulton, Lucas, Wood, Ottawa, Sandusky, Erie, Lorain, Cuyahoga, Summit, Portage, Trumbull and Mahoning Counties Ohio |
4265
|
Results
|
Feb 24, 2016 |
Mar 9, 2016 |
Portable Concrete Barrier |
4264
|
Results
|
Jan 27, 2016 |
Feb 10, 2016 |
Furnishing and Applying Herbicide on Right-Of-Way Areas, Between Milepost 0.0 and Milepost 241.2 |
4263
|
Results
Resolution No. 24-2016
|
Jan 26, 2016 |
Feb 9, 2016 |
One (1) each Current Model Truck Cab and Chassis and Furnishing and Installing One (1) Sixty (60) Foot Aerial Device with Digger |
4262
Addendum No. 1
Addendum No. 2
|
Results
|
Jan 12, 2016 |
Jan 27, 2016 |
High Bay LED Lighting |
4261 |
Results
Resolution 15-2016
|
Dec 22, 2015 |
Jan 8, 2016 |
540,000 Pounds Hot-Pour Ready Mixed Joint Sealant |
4260
|
Results
|
Dec 8, 2015 |
Dec 22, 2015 |
Pavement Sweeping Service |
4259
Addendum No. 1
|
Results
|
Nov 6, 2015 |
Nov 20, 2015 |
Pneumatic Tires |
4258
|
Results
|
Oct 26, 2015 |
Nov 9, 2015 |
Two (2) Each Hydraulic Drop Hammer Post Pounder with Puller and Drill and Offering Trade-In Credit or Purchase of Two (2) Each GMC Cab & Chassis with Mounted Post Pounders |
4257
Addendum No. 1
|
Results
|
Oct 15, 2015 |
Oct 29, 2015 |
Guardrail Materials |
4256
Q & A No. 1 |
Results
|
Oct 13, 2015 |
Oct 27, 2015 |
Eight (8) Each Fourteen (14') Foot Commercial Grade Enclosed Cargo Trailer |
4255
|
Results
|
Sep 8, 2015 |
Sep 22, 2015 |
Engine and Equipment Oils and Lubricants |
4254 |
Results
|
Aug 31, 2015 |
Sep 16, 2015 |
Pneumatic Tires |
4253
|
Results
|
Jul 24, 2015 |
Aug 7, 2015 |
Peterbilt Truck Parts and Service |
4252 |
Results
|
Jun 9, 2015 |
Jun 23, 2015 |
Liquid Calcium Chloride De-Icing Material with Corrosion Inhibitor |
4251 |
Results
|
Jun 4, 2015 |
Jun 18, 2015 |
Liquid De-Icing/Anti-Icing Material (Magnesium Chloride) |
4250
|
Results |
Jun 2, 2015 |
Jun 16, 2015 |
Organic-Based, Corrosion-Inhibited Liquid De-Icing/Anti-Icing Material |
4249
|
Results
|
May 28, 2015 |
Jun 11, 2015 |
Snow Plow Blades |
4248
|
Results
|
May 14, 2015 |
May 29, 2015 |
All Service and Materials for Laundry, Dry Cleaning, Pressing and Minor Repairs of Maintenance and Toll Collector Uniforms for a Period of Eighteen (18) Months |
4247 |
Results
|
May 12, 2015 |
May 27, 2015 |
Sodium Chloride (Rock Salt) |
4246
|
Results
|
May 1, 2015 |
May 18, 2015 |
Truck Mounted Full Matrix Changeable Message Boards |
4245
|
Results
|
Apr 23, 2015 |
May 7, 2015 |
Exterior LED Lighting |
4244
|
Results |
Apr 20, 2015 |
May 4, 2015 |
Inspection, Testing and Repair Services under a Maintenance Agreement for Emergency Power Generator Systems Located at various Commission Buildings |
4243
Plan Holders
|
Results
|
Feb 26, 2015 |
Mar 12, 2015 |
Furnish and Apply Retro-Reflective Pavement markings on the Ohio Turnpike Mainline Roadway and Interchange Ramps, M.P. 0.0 to 241.2; Williams, Fulton, Lucas, Wood, Ottawa, Sandusky, Erie, Lorain, Cuyahoga, Summit, Portage, Trumbull and Mahoning Counties |
4242 |
Results
|
Feb 3, 2015 |
Feb 18, 2015 |
Portable Concrete Barrier |
4241 |
Results
|
Jan 30, 2015 |
Feb 13, 2015 |
Requirements for Traffic Guides |
4240
|
Results
|
Jan 21, 2015 |
Feb 4, 2015 |
Requirements for Approximately 20,000 Gallons of Polymer-Modified, Asphalt-Based Pavement Sealer Concentrate |
4239
|
Results |
Jan 20, 2015 |
Feb 3, 2015 |
Furnish and Apply Herbicide on Right-of-Way Areas, Between M.P. 0.0 and M.P. 241.2 |
4238
Addendum
No. 1
|
Results |
Dec 22, 2014 |
Jan 9, 2015 |
Trash, Recyclable & Tire Debris Removal at the Ohio Turnpike and Infrastructure Commission’s Eight (8) Maintenance Buildings, Administration Building, State patrol Post 90 and Various Toll Plazas |
4237 |
Results
|
Dec 5, 2014 |
Dec 19, 2014 |
Approximately 540,000 Pounds Hot-Pour Ready Mixed Joint Sealant |
4236 |
Results
|
Oct 22, 2014 |
Nov 5, 2014 |
Pavement Sweeping Service |
4235
Addendum No. 1 |
Results |
Oct 14,2014 |
Oct 31, 2014 |
Twelve Month Service Contract for the Inspection, Testing and Repair of Fire Alarm Systems, Fire Sprinkler Systems and Fire Suppression/Extinguishing Systems Located in Various Commission Buildings |
4234
Addendum No. 1
Addendum No. 2 |
Results |
Sep 4, 2014 |
Sep 18, 2014 |
Thirty-Eight (38) Multi-Function Desktop Printers and Providing On-Site Maintenance for a Minimum of Five (5) Years |
4233 |
Results |
Aug 25, 2014 |
Sep 9, 2014 |
Replacement Parts and Service Labor for Sterling Trucks |
4232 |
Results |
Aug 11, 2014 |
Aug 25, 2014 |
Snow Plow Blades |
4231
Addendum No. 1
Addendum No. 2
Addendum No. 3
Addendum No. 4 |
Results |
Aug 8, 2014 |
Sep 5, 2014 |
Five (5) each Current Model Truck Cab and Chassis, 48,000 LB. GVWR and Furnishing and Installing Five (5) Dump Bodies, Front Plows, Wing Plows, Central Hydraulic Systems and Lighting Systems |
4230
Addendum No. 1 |
Results |
Aug 7, 2014 |
Aug 21, 2014 |
Organic-Based, Corrosion-Inhibited Liquid De-Icing/Anti-Icing material |
4229 |
Results |
Aug 5, 2014 |
Aug 19, 2014 |
Liquid De-Icing/Anti-Icing Material (Magnesium Chloride) |
4228 |
Results |
Aug 1, 2014 |
Aug 15, 2014 |
Pneumatic Tires |
4227
Addendum No. 1 |
Results |
Jul 31, 2014 |
Aug 14, 2014 |
Engine and Equipment Oils and Lubricants, for a period of one (1) year |
4226 |
Results |
Jul 11, 2014 |
Jul 25, 2014 |
Liquid Calcium Chloride De-Icing Material with Corrosion Inhibitor |
4225 |
Results |
Jul 10, 2014 |
Jul 24, 2014 |
Guardrail Materials |
4224 |
Results |
Jun 11, 2014 |
Jun 26, 2014 |
Two (2) each Portable Asphalt Recycling Machines and eight (8) each Asphalt Hotbox/Reclaimer Trailers |
4223
Addendum No. 1 |
Results |
Jun 4, 2014 |
Jun 25, 2014 |
Cut and Rolled Magnetic Toll Tickets |
4222 |
Results |
May 28, 2014 |
Jun 11, 2014 |
Repair and Replacement Parts for Sterling Trucks |
4221 |
Results |
May 8, 2014 |
May 22, 2014 |
Requirements for approximately 57,600 gallons of Polymer-Modified, Asphalt-Based Pavement Sealer Concentrate |
4220 |
Results |
May 5, 2014 |
May 19, 2014 |
Commercial Propane-Liquefied Petroleum Gas Fuel and Storage Equipment for Nine (9) Locations |
4219
Addendum No. 1 |
Results |
Apr 14, 2014 |
Apr 30, 2014 |
Furnish all Service for Removal, Transportation, Disposal and Testing of Slag Leachate Wastewater from one (1) location along the Ohio Turnpike |
4218
Addendum No. 1 |
Results |
Apr 10, 2014 |
Apr 25, 2014 |
Furnishing Ultra Low Sulfur Diesel Fuel and Unleaded Gasoline/Ethanol Blend |
4217 |
Results |
Mar 24, 2014 |
Apr 7, 2014 |
New Replacement and Repair Parts for Commission owned ET-2000/Plus™ and CAT-350™ System Impact Attenuators for a Period of Two (2) Years |
4216 |
Results |
Mar 17, 2014 |
Mar 31, 2014 |
Retro-Reflective and Non-Reflective Sheeting and Electronic Cuttable Overlay Film |
4215
Addendum No. 1 |
Results |
Mar 10, 2014 |
Mar 24, 2014 |
Furnish and Apply Retro-Reflective Pavement Markings on the Ohio Turnpike Mainline Roadway and Interchange Ramps, M.P. 0.0 to 241.2, Located in Williams, Fulton, Lucas, Wood, Ottawa, Sandusky, Erie, Lorain, Cuyahoga, Summit, Portage, Trumbull and Mahoning Counties |
4214 |
Results
|
Feb 27, 2014 |
Mar 13, 2014 |
Furnishing and Applying Herbicide on Right-of-Way Areas, Between M.P. 0.0 and 241.2 |
4213
Addendum No. 1 |
Results |
Feb 5, 2014 |
Feb 20, 2014 |
Two (2) Each 6,000 LB. Capacity Liquid Propane Lift Truck with Free Lift Mast |
4212 |
Results |
Jan 27, 2014 |
Jan 31, 2014 |
Sodium Chloride (Rock Salt) |
4211 |
Results |
Dec 19, 2013 |
Jan 9, 2014 |
Furnishing Approximately 495,000 Pounds Hot-Pour Ready Mixed Joint Sealant |
4210
Addendum No. 1 |
Results |
Nov 12, 2013 |
Nov 26, 2013 |
Portable Concrete Barrier |
4209 |
Results |
Oct 15, 2013 |
Oct 29, 2013 |
All Service and Materials for Laundry, Dry Cleaning, Pressing and Minor Repairs of Maintenance and Toll Collector Uniforms for a Period of Eighteen (18) Months |
4208
Addendum No. 1 |
Results |
Sept 13, 2013 |
Sept 27, 2013 |
All Service and Materials for Cleaning of all the Commission’s Toll Plazas and Ohio State Highway Patrol Posts 89, 90 & 91 |
4207
Addendum No. 1
Addendum No. 2 |
Results |
Sept 11, 2013 |
Sept 27, 2013 |
Eight (8) Each Current Model Truck Cab and Chassis, 40,000 LB. GVWR and Furnishing and Installing Eight (8) Dump Bodies, Front Plows, Central Hydraulic Systems and Lighting Systems |
4206 |
Results |
Sept 6, 2013 |
Sept 20, 2013 |
Liquid De-Icing/Anti-Icing Material (Magnesium Chloride) |
4205 |
Results |
Aug 22, 2013 |
Sept 6, 2013 |
Pavement Sweeping Service |
4204 |
Results |
Aug 12, 2013 |
Aug 26, 2013 |
Pneumatic Tires |
4203
Addendum No. 1 |
Results |
Jun 13, 2013 |
Jun 28, 2013 |
Furnish a Complete Maintenance Agreement for Elevators Located at Various Commission Buildings for a Period of One (1) Year. |
4202
Q&A |
Results |
Jun 6, 2013 |
Jun 20, 2013 |
Sodium Chloride (Rock Salt) |
4201 |
Results |
May 10, 2013 |
May 24, 2013 |
Guardrail Materials |
4200
Addendum No. 1 |
Results |
May 9, 2013 |
May 28, 2013 |
Inspection, Testing and Repair Services under a Maintenance Agreement for Emergency Power Generator Systems located at various Commission Buildings |
4199 |
Results |
Mar 18, 2013 |
Apr 2, 2013 |
Requirements for approximately 42,200 gallons of Coal Tar pitch Emulsion Concentrate |
4197
Plan Holders |
Results |
Feb 15, 2013 |
Mar 4, 2013 |
Furnish and Apply Retro-Reflective Pavement Markings on the Ohio Turnpike Mainline Roadway and Interchange Ramps, Milepost 0.0 to 241.2, Located in Williams, Fulton, Lucas, Wood, Ottawa, Sandusky, Erie, Lorain, Cuyahoga, Summit, Portage, Trumbull and Mahoning Counties. |
4196 |
Results |
Feb 19, 2013 |
Mar 5, 2013 |
Furnishing and Applying Herbicide on Right-of-Way Areas, Between M.P. 0.0 and M.P. 241.2. |
4195
Addendum No. 1 |
Results |
Feb 6, 2013 |
Feb 21, 2013 |
Requirements for 460,000 Pounds Hot-Pour, Ready Mixed Joint Sealant |
4194 |
Results |
Dec 27, 2012 |
Jan 17, 2013 |
One (1) Current Model Truck Cab and Chassis, 24,000 lb. GVWR |
4192 |
Results |
Nov 15, 2012 |
Nov 30, 2012 |
Requirements for Trash, Recyclable & Tire Debris Removal at the Ohio Turnpike Commission’s Eight (8) Maintenance Buildings, Administration Building, State Patrol Post 90 and Various Toll Plazas |
4191
Addendum No. 1 |
Results |
Nov 1, 2012 |
Nov 27, 2012 |
Furnish, Install, Configure and Test, Dispatch Console System Equipment at Two (2) Ohio Turnpike Commission Facilities Located in Cuyahoga County, Ohio |
4190
Addendum No. 1 |
Results |
Sep 27, 2012 |
Oct 19, 2012 |
For the Furnishing and Installation of One (1) Natural Gas Powered, Current Model year, Emergency Stand-By Generator System |
4189
Addendum No. 1
Addendum No. 2
Addendum No. 3 |
Results |
Sep 11, 2012 |
Oct 2, 2012 |
Interior and Exterior Service Plaza Furniture |
4188 |
Results |
Aug 21, 2012 |
Sep 5, 2012 |
Liquid De-Icing/Anti-Icing Material (Magnesium Chloride) |
4187
Addendum No. 1 |
Results |
Aug 9, 2012 |
Aug 23, 2012 |
Sodium Chloride (Rock Salt) |
4186 |
Results |
Jul 26, 2012 |
Aug 9, 2012 |
Pneumatic Tires |
4185
Addendum No. 1
Addendum No. 2 |
Results |
Jun 7, 2012 |
Jun 28, 2012 |
Four (4) Each Current Model Truck Cab and Chassis, 48,000 lb. GVWR and Furnishing and Installing Four (4) Dump Bodies, Front Plows, Wing Plows, Central Hydraulic Systems and Lighting Systems |
4184 |
Results |
Apr 26, 2012 |
May 10, 2012 |
Repair and Replacement Parts for the Sterling Trucks |
4183
Addendum No. 1 |
Results |
Apr 19, 2012 |
May 3, 2012 |
Full Matrix Portable Changeable Message Boards |
4182 |
Results |
Apr 11, 2012 |
Apr 25, 2012 |
441 Intermediate Course and 302 Base Course Asphalt Concrete for delivery to the Elmore Maintenance Building |
4181 |
Results |
Mar 30, 2012 |
Apr 16, 2012 |
All Service for Removal, Transportation, Disposal and Testing of Slag Leachate Wastewater from One (1) Location along the Ohio Turnpike |
4180 |
Results |
Mar 16, 2012 |
Apr 2, 2012 |
All Service and Materials for Laundry, Dry Cleaning, Pressing and Minor Repairs of Maintenance and Toll Collector Uniforms for a Period of Eighteen (18) Months. |
4179 |
Results |
Feb 21, 2012 |
Mar 6, 2012 |
New Replacement and Repair Parts for Commission Owned ET-2000/Plus and CAT-350 System Impact Attenuators for a period of Two (2) Years |
4178 |
Results |
Feb 2, 2012 |
Feb 16, 2012 |
Furnishing and Applying Herbicide on Right-of-Way Areas, Between M.P. 0.0 and M.P. 241.2 |
4177
Plan Holders |
Results |
Jan 20, 2012 |
Feb 3, 2012 |
Furnish and Apply Retro-Reflective Pavement markings on the Ohio Turnpike Mainline Roadway and Interchange Ramps, Milepost 0.0 to 241.2, Located in Williams, Fulton, Lucas, Wood, Ottawa, Sandusky, Erie, Lorain, Cuyahoga, Summit, Portage, Trumbull, and Mahoning Counties |