2023 OHIO TURNPIKE
COMPLETE STANDARD DRAWINGS SET
AS OF 10/17/2023
CLICK HERE
Standard Drawings By Sections:
INDEX 11.08.2024 - OHIO TURNPIKE STANDARD DRAWINGS
AS-1 2023.10.17 (3 Sheets) - REINFORCED CONCRETE APPROACH SLAB
CB-1 2019.12.31 - CATCH BASIN, NO. CB-1 WITH SLOPE DRAIN DETAIL
CB-2 2017.10.20 - CATCH BASIN, NO. CB-1 RECONSTRUCTED
CB-3 2017.10.20 - CATCH BASIN, MEDIAN WALL
CB-3A 2021.02.09 - CATCH BASIN, MEDIAN WALL FOR SINGLE SLOPE BARRIER
CB-4 2023.10.17 - INLET, NO. I-3B50 DOUBLE GRATE
CB-4A 2023.10.17 (2 Sheets) - INLET, NO. I-3B50 DOUBLE GRATE FOR SINGLE SLOPE BARRIER, TYPE B50
CB-5 2023.10.17 - INLET, NO. I-3C50 DOUBLE GRATE
CB-5A 2023.10.17 (2 Sheets) - INLET, NO. I-3C50 DOUBLE GRATE FOR SINGLE SLOPE BARRIER, TYPE C50
CBR-1 2021.02.09 - CONCRETE BARRIER, TYPES B-50 AND C-50, AS PER PLAN
CBR-2 2018.09.26 - CONCRETE BARRIER, SINGLE SLOPE, TYPES B-50 AND C-50 AS PER PLAN
CJ-1 2017.10.20 - CRACK AND JOINT DETAILS AT FULL DEPTH CONCRETE REPAIRS
CJ-2 2017.10.20 - CRACK AND JOINT DETAILS AND FULL DEPTH ASPHALT REPAIRS
CL-1 2023.10.17 - CHAIN LINK SAFETY FENCE (ALL ALUMINUM) DETAILS, TYPE 1
CL-2 2023.10.17 - CHAIN LINK SAFETY FENCE (ALL ALUMINUM) DETAILS, TYPE 2
DJ-1 2019.12.31 - DECK JOINT DETAILS CELLULAR ABUTMENTS
DJ-2 2017.10.20 - DECK JOINT DETAILS
DJ-3 2017.10.20 - DECK JOINT DETAILS BRIDGES WITH SIDEWALKS
DJ-4 2017.10.20 - DECK JOINT DETAILS SPILL - THRU ABUTMENTS
DJ-5 2017.10.20 - DECK JOINT DETAILS AT PIERS
DJ-7 2017.10.20 - DECK JOINT DETAILS SP 533D - CONTINUOUS ELASTOMER SEAL IN A PORTLAND CEMENT CONCRETE JOINT
DJ-9 2021.01.07 - DECK JOINT DETAILS SP 533F- REPLACEMENT OF COMPRESSION SEAL WITH CONTINUOUS ELASTOMERIC SEAL
DR-1 2017.10.20 - PRECAST FLARED EN SECTION
EPA-1 2017.10.20 - EMERGENCY PARKING AREA
F-1 2021.01.07 - RIGHT OF WAY FENCE
RPM-1 2023.02.17 - RAISED PAVEMENT MARKER AND STRIPING LAYOUT
SBR-50 2018-09-19 - 50" SINGLE SLOPE CONCRETE MEDIAN BRIDGE PARAPET
TC-1 2017.10.20 - TRAFFIC CONTROL BRIDGE AND BARRIER SIGN SUPPORT DETAILS
TC-2 2023.02.17 - TRAFFIC CONTROL SPEED MEASUREMENT MARKING
TC-3 2023.02.17 - TRAFFIC CONTROL MISCELLANEOUS DELINEATION
TC-4 2021.01.07 - TRAFFIC CONTROL 2 - LANE HIGH SPEED CROSSOVER DELINEATION
TCB-1 2017.10.20 - REQUIREMENTS FOR PORTABLE BARRIER SETTING AND REMOVAL OPERATIONS
TCB-2 2017.10.20 - PORTABLE BARRIER STORAGE DETAILS
TCB-3 2017.10.20 - MEDIAN BARRIER WALL CLOSURE DETAILS
TCR-1 2023.02.17 - TEMPORARY TRAFFIC CONTROL GENERAL NOTES
TCR-2 2023.02.17 - TEMPORARY TRAFFIC CONTROL DETAILS, LEGEND, NOTES AND STANDARD SINGLE LANE CLOSURE
TCR-3 2021.01.07 - TEMPORARY TRAFFIC CONTROL 2-LANE BI-DIRECTIONAL TRAFFIC
TCR-4 2021.01.07 - TEMPORARY TRAFFIC CONTROL BI-DIRECTION ROADSIDE DELINEATION
TCR-5 2021.01.07 - TEMPORARY TRAFFIC CONTROL TWO LANE SPECIAL BI-DIRECTIONAL ZONE
TCR-6 2023.02.17 - TEMPORARY TRAFFIC CONTROL TOLL PLAZA LANE CLOSURES
TCR-7 2021.01.07 - TEMPORARY TRAFFIC CONTROL TWO LANE CROSSOVER DETAILS
TCR-8 2021.01.07 - TEMPORARY TRAFFIC CONTROL TWO LANE SPECIAL CROSSOVER DETAILS
TCR-9 2021.01.07 - TEMPORARY TRAFFIC CONTROL SHORT DURATION/SHORT TERM SHOULDER CLOSURE
TCR-9.1 2023.02.17- TEMPORARY TRAFFIC CONTROL LANE CLOSURE AT EXIT AND ENTRANCE RAMPS
TCR-9.2 2023.02.17 - TEMPORARY TRAFFIC CONTROL LANE CLOSURE AT EXIT AND ENTRANCE RAMPS
TCR-9.3 2023.02.17 - TEMPORARY TRAFFIC CONTROL DOUBLE LANE CLOSURE AT EXIT AND ENTRANCE RAMPS
TCR-9.4 2023.02.17 - TEMPORARY TRAFFIC CONTROL DOUBLE LANE CLOSURE AT EXIT AND ENTRANCE RAMPS
TCR-10 2023.02.17 - TEMPORARY TRAFFIC CONTROL DOUBLE LANE CLOSURE
TCR-11MZ 2023.02.17 - TEMPORARY TRAFFIC CONTROL FOR SINGLE LANE MOBILE OPERATION
TCR-11PS 2023.02.17 - TEMPORARY TRAFFIC CONTROL PAVEMENT STRIPING MOVING ZONE
TCR-12 2023.02.17 - TEMPORARY TRAFFIC CONTROL SINGLE AND DOUBLE LANE SHIFT ZONES
TCR-13 2021.01.07 - SONIC NAP ALERT PATTERN (SNAP)
TCR-14 2021.01.07 - TEMPORARY TRAFFIC CONTROL SINGLE LANE CLOSURE WITH PORTABLE BARRIER
TCR-15 2024.10.08 - TEMPORARY TRAFFIC CONTROL SIGNS FOR MAINTENANCE AND CONSTRUCTION
UD-1 2018.09.19 - UNDER-DRAIN DETAILS
XOV-1 2019.03.01 - EXISTING CROSSOVER RESURFACING DETAIL
XOV-2 2019.03.01 - CROSSOVER CONSTRUCTION PLAN
XOV-3 2018.09.19 - MAINTENANCE CROSSOVER DETAILS